Some of Our Projects
Pier One Hotel Guestrooms Refurbishment

Project Background
Owned by Pier One Developments Pty Ltd the hotel comprises 189 rooms, bar, restaurant and conference facilities. RK PM were engaged in 2018 to complete the full guestroom refurbishment including full strip out.
The project was delivered seamlessly across 6 stages whilst the hotel remained fully operational.
Outline Scope of Works
- Full refurbishment of guestrooms and suites
OUR ROLE
Project Manager
PROJECT VALUE
$13 Million
PROJECT LOCATION
Sydney, NSW
CONSTRUCTION COMPLETE
2019
PROJECT TEAM
Interior Designer
Tonkin Zulaikha Greer
Contractor
Reward Hotel Projects

Crowne Plaza Alice Springs

Project Background
The Crowne Plaza Hotel, is located in the Lasseters Casino and Conference Centre in Alice Springs, NT. The project included the complete refurbishment of 139 guestrooms and bathrooms in a live operating environment. Significant fire life safety upgrades were also completed at the hotel as part of the project.
Outline Scope of Works
- Guestroom and bathroom refurbishment
OUR ROLE
Project Manager
PROJECT VALUE
$7 Million
PROJECT LOCATION
Alice Springs, NT
CONSTRUCTION COMPLETE
2018
PROJECT TEAM
Interior Designer
WMK
Contractor
Reward Hotel Projects

Travelodge Bankstown New Rooms

Project Background
The Hotel tower is located within the Bankstown Sports Club in Bankstown CBD. The project involved the addition of four floors on the existing hotel tower increasing the Hotel inventory by 108 guestrooms.
The project was delivered in 2 stages.
Outline Scope of Works
- Additional four floors to the existing tower
- Construction and fitout of 108 guestrooms
OUR ROLE
Project Manager
PROJECT VALUE
Confidential
PROJECT LOCATION
Bankstown, NSW
CONSTRUCTION COMPLETE
2019
PROJECT TEAM
Architecture / Interior Designer
Curtin Architects / WMK
Contractor
Paynter Dixon

The Fullerton Hotel Sydney Gymnasium

Project Background
The Fullerton Hotel Sydney is located at No. 1 Martin Place. The project involved the repurposing of unused space in the Heritage wing of the Hotel. The building has state significant heritage listing and strict heritage constraints had to be incorporated into the design and execution of the works.
Outline Scope of Works
- Full strip out
- Gymnasium fitout and new amenities
OUR ROLE
Project Manager
PROJECT VALUE
$600k
PROJECT LOCATION
Sydney CBD, NSW
CONSTRUCTION COMPLETE
2019
PROJECT TEAM
Architecture and Interior Designer
MARS Pty Ltd
Contractor
Icon Living

Manly Wharf Restaurants

Project Background
Manly Wharf is the iconic gateway to Manly and it has been transformed into a dining and shopping destination. RK PM were engaged in 2016 to complete the development of a second story to the wharf building to house two large scale restaurants. The project presented strict environmental and heritage constraints that had to be incorporated into the design to achieve compliance. Heavy construction works had to be planned around existing tenants within a live operating environment.
The design incorporated complex structural reconfiguration of post tensioned elements within the existing building as well as strict height limitations to the new roof line which presented the architect with the challenge to take advantage and maximise the exposure to this unique harbour front location.
Outline Scope of Works
- Demolition and reconfiguration of existing structural elements
- Construction of second story above the wharf building
- Lessors works
OUR ROLE
Project Manager
PROJECT VALUE
$10 Million
PROJECT LOCATION
Manly, NSW
CONSTRUCTION COMPLETE
2018
PROJECT TEAM
Architecture and Interior Designer
JPRA
Contractor
Reward Group

Travelodge Blacktown Modular Expansion

Project Background
The Travelodge Blacktown Hotel is located within the Workers Club site in Blacktown NSW. RK PM were engaged to carry out the feasibility, design, procurement and delivery of the modular expansion of the hotel.
The modules were delivered to site complete with fully fitted out bathrooms, kitchenettes and guestroom joinery and were erected in 3 days. Services connections, corridors, façade and roof were completed in the subsequent two months reducing the overall time on site from 9 months to 4 significantly mitigating disruptions to the hotel operations.
Outline Scope of Works
- Modular Hotel construction
OUR ROLE
Project Manager
PROJECT VALUE
$5 Million
PROJECT LOCATION
Blacktown, NSW
CONSTRUCTION COMPLETE
2018
PROJECT TEAM
Architecture and Interior Designer
WMK
Contractor
RCQ Contracting

International Grammar School Library Project

Project Background
The International Grammar School is located at Ultimo only moments from Sydney CBD. As part of a broader master plan to continue to expand and enhance the learning and community spaces within the IGS campus, the Bibliotheque (Library) project consist of the expansion of the library foot print and the refurbishment and repurposing of existing space within the Reg St Leon Building. The Bibliotheque will become a landmark library, learning and research centre for all student levels and the broader school community.
As part of the project, the adjoining Colleagues lounge will be fully refurbished and expanded as a flexible space to cater for all IGS staff needs and also to open out onto the new Bibliotheque space and become a multipurpose space for special functions and events when the library is not in use.
Outline Scope of Works
- Complete strip out
- Demolition and structural reconfiguration
- New conservatory building and roof top space
- New amphitheatre
- Refurbishment of existing space
OUR ROLE
Project Manager
PROJECT VALUE
$3.5 Million
PROJECT LOCATION
Ultimo, NSW
CONSTRUCTION COMPLETE
Scheduled completion 2020
PROJECT TEAM
Architecture and Interior Designer
BVN Architects
Contractor
Rohrig NSW Pty Ltd

International Grammar School Centre for the Dramatic Arts

Project Background
The International Grammar School is located at Ultimo only moments from Sydney CBD. As part of a broader master plan to continue to expand and enhance the learning and community spaces within the IGS campus, The Centre for Dramatic Arts project consists of the refurbishment and reconfiguration of the existing space in the Wright Building on levels 3 and 4. The project also involves the expansion of the footprint and roof to accommodate a new back stage space. The new theatre on level 4 will have the capacity to serve as a lecture hall, drama workshop and a performance stage with capacity for 100+ students.
As part of the project, the existing heritage trusses will be replaced with slender steel portal frames to substantially improve the sightlines from all levels of seating.
Outline Scope of Works
- Complete strip out
- Demolition and structural reconfiguration
- New performance theatre
- Refurbishment of existing space
OUR ROLE
Project Manager
PROJECT VALUE
$2.5 Million
PROJECT LOCATION
Ultimo, NSW
CONSTRUCTION COMPLETE
Scheduled completion 2020
PROJECT TEAM
Architecture and Interior Designer
BVN Architects
Contractor
Rohrig NSW Pty Ltd

Pier One Bathrooms Refurbishment

Project Background
Owned by Pier One Developments Pty Ltd the hotel comprises 189 rooms, bar, restaurant and conference facilities. RK PM were engaged in 2015 to complete the full refurbishment of the bathrooms. The project also included the conversion of the existing vacuum drainage system to a gravity system.
The project was delivered seamlessly across 13 stages whilst the hotel remained fully operational without any disruption to the Hotel business.
Outline Scope of Works
- Full refurbishment of bathrooms
- Conversion of vacuum drainage system to gravity drainage system
- Replacement of hydraulic infrastructure
OUR ROLE
Project Manager
PROJECT VALUE
$5 Million
PROJECT LOCATION
Sydney, NSW
CONSTRUCTION COMPLETE
2016
PROJECT TEAM
Architecture and Interior Designer
Bates Smart
Contractor
Reward Hotel Projects

63 Britton St Smithfield NSW – Industrial Development

Project Background
The Client was left with a dated and heavily customized configuration of an industrial asset untenable to the market following the end of term on the lease. The asset needed to be fully repositioned before it could be taken to the market. The project involved the complete strip out of redundant infrastructure, full refurbishment of 1,700m2 of office space, repurposing of 15,000m2 of warehouse space, full upgrade of the fire protection system, new façades and landscape.
Outline Scope of Works
- Complete strip out
- Refurbished office space
- Refurbished warehouse space
- New electrical infrastructure
- New fire protection systems
OUR ROLE
Project Manager
PROJECT VALUE
$3.5 Million
PROJECT LOCATION
Smithfield, NSW
CONSTRUCTION COMPLETE
2018
PROJECT TEAM
Architecture and Interior Designer
HL Architects
Contractor
Intrec Management

Travelodge Bankstown Room Refurbishment

Project Background
The Hotel tower is located within the Bankstown Sports Club in Bankstown CBD. The project was part of the “Travelodge Refresh” refresh rollout programme for a portfolio of hotels. 108 guestrooms were refurbished in 8 weeks in a fully Hotel and Club operational environment.
The Travelodge Refresh Program incorporated cost effective smart design changes that maximised improvement to the guest experience whilst minimising disruptions to the Hotel operation maximising return on investment.
The project was delivered seamlessly across 4 stages whilst the hotel remained fully operational with limited disruption to the Hotel business.
Outline Scope of Works
- Replacement of joinery
- Partial refurbishment of bathrooms
- Replacement of air conditioning system and controls
- Full refresh of finishes in guestrooms and bathrooms
OUR ROLE
Project Manager
PROJECT VALUE
$1 Million
PROJECT LOCATION
Bankstown, NSW
CONSTRUCTION COMPLETE
2016
PROJECT TEAM
Architecture and Interior Designer
WMK
Contractor
Infigo

Travelodge Sydney Lobby Refurbishment

Project Background
Travelodge Sydney is located on the corner of Wentworth Ave and Commonwealth St. The Hotel is comprised of 417 guestrooms and runs at high occupancy year round creating challenges for the Hotel managing large amounts of guests during busy check in and check out periods. The project involved the expansion and full refurbishment of the reception lobby space to enhance the guest arrival experience by adding additional check in/out stations and new functional seating spaces.
The project also included a complete revamp of the back of house administration space.
Outline Scope of Works
- Demolition
- New reception fittout
OUR ROLE
Project Manager
PROJECT VALUE
$300K
PROJECT LOCATION
Sydney CBD, NSW
CONSTRUCTION COMPLETE
2019
PROJECT TEAM
Architecture and Interior Designer
WMK
Contractor
Icon Living

Travelodge Wynyard New Rooms

Project Background
Travelodge Wynyard is located at the busy intersection of York and Margaret Streets in Sydney CBD. The project consisted of constructing new guestrooms on top of the Travelodge Wynyard Tower in an unused section of the roof.
Outline Scope of Works
- New building envelope
- Guestroom fitout
- Building services expansion
OUR ROLE
Project Manager
PROJECT VALUE
$1.3 Million
PROJECT LOCATION
Sydney CBD, NSW
CONSTRUCTION COMPLETE
2016
PROJECT TEAM
Architecture and Interior Designer
WMK
Contractor
Taylor Constructions

Golden Door Elysia Villas Refurbishment

Project Background
Golden Door Elysia is a health retreat located in the Hunter Valley NSW and it is comprised of 73 privately owned villas, health retreat, spa, restaurant and conference facilities. The villas are managed by the retreat and are scheduled to be renovated in three separate stages.
Outline Scope of Works
- New finishes throughout
- New FF&E
OUR ROLE
Project Manager
PROJECT VALUE
Confidential
PROJECT LOCATION
Hunter Valley, NSW
CONSTRUCTION COMPLETE
Scheduled 2021
PROJECT TEAM
Interior Designer
A+ Interiors